Category Archives: Ashby Canal

Autumn 2018 News

WINTER STOPPAGES
ASHBY CANAL

From Date: 2nd January 2019 at 8.00
To Date 29th March at 16.00 inclusive

Towpath & Navigation closed at Bridge 6, Bramcote Road Bridge.
Up Stream Winding Hole: Junction With Coventry Canal
Down Stream Winding Hole: Basin Bridge 22, Basin Bridge Lane.

Description:
Above-water repairs to the cracked arch of the bridge, parapets, soffit & weathered sandstone stonework.
Repairs to the wet abutment, below water level, will also be carried out.
The extent of these works will not be known until the navigation is de-watered.
Relocation of bat roosts within the arch may dictate timing of the works.