Please click on an image to see a larger version.
1. Clay being dug for SSSI habitat
2. Dumpers bring clay round from other areas of the marina site
3. Clay base is shaped and rolled
4. sheepsfoot roller compacts the clay
5. Pond is taking shape now
6. The central bund is constructed
7. The excavators shaping the bottom and sides of the pond
8. The final finishing touches are added
9.The connecting pipe from the canal is installed
10. Water fills the pond